Wednesday, July 8, 2015

Q3 Goals

So I have been MIA for the last 6 months....so it's time to remove all of the cobwebs and get back to setting my quarterly goals.  During the last 6 months lots have happened here on the home front, including 7 weeks of travel for my day job, moving to a new town and a quilt retreat (in no particular order).

For Quarter 3 I plan to complete the following projects:

#1 Snack Time baby quilt - This quilt needs to be quilted, bound and labeled.



#2 Chevron baby quilt - This quilt needs to be quilted, bound and labeled.


#3 Triangle baby quilt - This quilt needs to be quilted, bound and labeled.


#4 Leaf wall hanging or quilt - I have not decided what size this one will be.  Right now it is all cut out as a wall hanging.



#5 Dr. Who - I have been bad with my Dr. Who quilt.  It has not been touched in months and is sitting quietly in the closet waiting to be worked on.  Hopefully I can find some time to dedicate to this quilt. 



#6 Grandmother's flower garden – Need to decide on a design....or make more flowers

#7 Wall Hanging: Totem Poles – need to finish the appliqué


Linking up to On the Windy Side.

No comments:

Post a Comment